Gering High School Addition & Renovation
Connecting Quality & Integrity Since 1941Project Description
- Client: Scotts Bluff County School District 79-0016
- Location: Gering, NE
- Project Size: 121,000 SF
- Schedule: June 2018 – Aug 2019 (expected)
- General Contractor: Hausmann Construction, Inc.
- Contract Sum: $7.4 Million
Project Summary: This high school addition and renovation project has been quite the challenge with mother nature. During this project, the basement mechanical room, flooded 3 times due to severely heavy rain and snow fall damaging newly installed equipment as well as tools and machinery, but that didn’t stop us from getting the job done.
Areas of renovation include; The existing 2,254 SF Gym, the existing 5,000 SF Weight room, the existing 3,367 SF Locker Room, the existing 7,464 SF Admin and Lobby area, 6,207 SF Library & Computer Classroom renovation, 27,000 SF of Classroom and Hallway renovation. Newly constructed space features a 22,880 SF Commons and Kitchen area, a 14,620 SF Auxiliary Gym with two basketball courts and an independent wrestling room complete with a 5,073 SF Locker Room. A new 1,775 SF Stage addition to the theater area and a new 10,482 SF Freshman Academy building. 5 new indoor Air Handling Units, 3 new water heaters, a new remote chiller, 2 new large boilers and lots of other upgrades to make this a state of the art educational facility once again.