RWHS MEP Upgrades
Connecting Quality & Integrity Since 1941Project Description
- Client: Regional West Medical Center
- Location: Scottsbluff, NE
- Schedule: February 2019 – December 2019 (expected)
- General Contractor: Beckenhauer Constriction, Inc.
- Subcontract Sum: $4.9 Million
Project Summary: Mechanical Electrical and Plumbing upgrades for the Chillers, Generators, AHU-35 & DA Tank. This project was a massive upgrade Mechanical System at RWMC. Every activity had to be carefully planned on this project to ensure proper fitment of all elements for all trades. Once again, we utilized our laser scanner and created our own 3D model at multiple points throughout the duration of this project; once before demolition had started, once when everything was demolished and again after everything was set in place to ensure quality. During the coordination process we noticed the existing environment did not match the construction documents. This information was conveyed to the rest of the design team and was able to be observed & evaluated for an appropriate decision on moving forward. During this project, we had to set up some temporary equipment to eliminate unnecessary down time for the Hospital.